The first 70 kilometers of the Nakuru–Eldoret road open to traffic
The first stage of a four-lane divided road on a 138 km section of the East African trade corridor was opened with a ceremony.
The first 70 kilometers of the Nakuru–Eldoret road open to traffic
The first stage of a four-lane divided road on a 138 km section of the East African trade corridor was opened with a ceremony.
Selvi Tarım commissions the second stage of its irrigation project in Senegal
With the second stage of the Saint Louis Irrigation Network, another 16,000 hectares were opened to irrigated farming; rice…
Selvi Holding publishes its 2025 Annual and Sustainability Report
Consolidated revenue reached USD 4.2 billion; the lost-time injury frequency fell to 0.31 and the renewable energy share rose to…
Selvi Academy: vocational training for 6,200 people on overseas sites
Selvi Academy turns sites into open-air schools: in 2025, 6,200 people earned certificates from welding to equipment operation.